Lots Of New Parts

I intended to post this last night as normal on a Sunday, but the time I got half way through it all it was getting late. So it has been delayed until today, but I think it will be worth the wait.

So the weekend just gone I knew what my tasks were going to be at Mustang Maniac, not cleaning up this time, but adding the last bits of pipe work and connections to the engine. I arrived and found Adam moving a load of new orders around in the offices and stock rooms where we discussed the plan of action for the day. I was given a collection of parts and made my way to the workshop.

bits

As I opened the door and found my new Magnum 500 wheels fitted with their tyres, one was already partly on the car, the guys thought that I would like to fit them on myself, which of course I did. The wheels were a special shipping order by Adam (as the last set were sold early last week), they arrived within the week ready to be fitted with tyres and balanced. All I can say is OMG they look awesome on the car. Thanks Adam for getting them so quickly. The protective paint over the white lettering will be left on for now until in the mean time of working on the car so they don’t get scuffed.

As I was looking under the car Adam arrived with even more parts which were going to be fitted. Adam showed me the exhaust pipes that Yogi had fabricated as a custom fit from the oversized headers. As the main pipes was slightly smaller than the three-inch header bores the step down was made to fit. As these headers sit low under the car, care was taken to clamp them up to give as much clearance as possible. At this point there is no H-pipe crossover as I wanted to hear what the engine note was like without it. This will be a mod that Yogi can do at a later date (but he don’t know it yet) if I don’t like it. Due to the larger exhaust pipes the standard hand brake lever will catch the pipes and so had to be modified to be out-of-the-way of the exhaust. Yogi worked his magic and redesigned the part which now has a gentle S-curve to it. You can just make it out after the white headers on the right hand side in these pics.

I was told to take my carb back off again as I hadn’t put the correct gaskets in place. Adam spotted it on my blog and thought I had the correct ones. The gaskets would have worked what I had on there, but not how it should have been and could have caused engine running issues or not as smooth as it should be. So here is the correct sequence with the 4v gaskets and not the open style that I had previously had a half and half mixture of.

Yogi has also been busy fitting the transmission cooling lines to the radiator which are made of Copper-Nickel. They look like copper to start with but are much tougher, harder to bend and will dull down and weather to look like the stock steel pipes. The fittings at the radiator are unique to Mustang Maniac as they were designed by them and have them made in batches. These hand crafted pipes are designed to follow the original route at the front but take a more custom line due to the headers and the starter motor.

To get the starter motor in is a simple job, two bolts one top and one bottom, however, due to the space that is taken up by the headers this is no easy feat to achieve. In order to get the starter in place I had to remove the idle arm link and massage the transmission pipes out-of-the-way to fit it in place.

The transmission pipes will come up behind the starter and be joined by the starter motor power lead when that gets added next week. You can see the mounting hole for the starter and then it’s a case of wiggle it in place and get a bolt in. The starter is a heavy bit of metal and the ideal scenario is to get it fitted in quick as possible before your arms start to ache.

With the starter in place it was back on with the suspension linkage. Now it was time to let the car back down again and work on the top of the engine. While I was under the engine I fitted the new oil filter ready to be filled up. Adam disappeared for a few minutes and turned back up with my rocker covers that I had been aching to fit. The black “289 Powered by Ford” set with their new gaskets. He laid them on my now ever decreasing parts boxes and said “I have been saving these for you.”

We removed the old rocker covers that were just resting in place, fitted the new gaskets to the new covers and started to fit the new covers in place.

With the left side bank cover going on we then added some quality oil into the car to allow it to settle down to a level while we work on other bits.

rockcov4

The transmission oil was added to the gearbox about half to start with then that was allowed to settle.

fluid3

While that was settling the front fan and power steering pump belts were added and tensioned correctly.

It got busy with the battery tray and drilled the back location hole and tightened it all up ready for the Autolite battery to be put in place week.

batTray

The PCV pipe was added to the right bank rocker cover and the carb spacer, brake booster pipe fitted to the back of the engine block, the ignition coil was added where I custom fitted the wires to fit their new location to look neat. Water was added to the radiator and the satisfactory gurgle and bubbling of the engine block was like a music to my ears. Just for now that is most of the pipe work and fluids added to the car. Of course the levels will be checked and topped up again after it has been fired up.

rockcov8

Yet again the day was a long one yet I didn’t notice as time flies when you’re having fun, which I certainly was.

Last weeks homework:

That was all about my old spare wheel. The wheel was filthy dirty and needed some work.

The wheel was given a proper clean inside and out to see what needed to be done in way of repairs. The result wasn’t to bad at all under the gunge. The rough bits of paint and rust were removed with wire wool and thoroughly degreased again.

The tyre was in pretty good shape and was masked up and given a couple of light layers of red oxide primer and allowed to dry in the sun. before adding the last coats of the full painted oxide.

The gloss black was applied after an hour or so once the red oxide had fully dried. This again was added in light layers and built up to give the final look.

The masking was removed and the white wall cleaned along with the rubber tyre. The final result is a good a new spare wheel which will go into the trunk later on.

Another large post I know but we got so much done and I hope it was worth the wait.  Will we turn the key next week? I’m not so sure as there is a little more to be done on the wiring, connecting and tidying up etc and I have ordered a part for the carb to make the fuel line look neater. But it won’t be far away at all now. 🙂

Share my Content

A Glimpse Of Colour

As each batch of photos of my car in the paint shop are sent to Adam at Mustang Maniac I get more excited. The new process for letting me get to see them, a single teaser photo, followed by the rest of the batch once Adam has sorted them out, or thinks I have sweated it out long enough. 🙂 I know Adam has been keeping a real close eye on the progress and has supplied the colour swatches for the interior paint. The preparation and speed of progress on the car is just amazing, so much so that I am beginning to wonder, will I get an early Christmas prezzie in the form of my car fully painted? These few pics show more primer and blocking work before the colour top coats are applied.

The trunk has had the inside cleaned up to remove any light rust and the bits I inevitably missed. The shiny steel almost looks to good to paint, but seeing the top coat of colour on an outside panel soon changed my mind.

Engine.

Now the paint has dried out, but not yet fully cured as that won’t happen until the engine runs and gets hot of course. In the mean time I replaced the parts I intended to: The water thermostat and chrome thermostat housing, water temperature sender unit, water heater elbow connection and new distributor vacuum advance valve.

The egine now looks like new, all except the old distributor cap and rocker covers that I put back on for now, that’s just to keep the dirt and dust out until we are sure the valves don’t need to be adjusted. Then the proper ones will go on in the car later.

I AS I have been busy behind the scenes too, I have added a couple of walk through photo sets for refurbishing the starter motor and replacing the water thermostat on the engine.

Quick Links:

Photo menu – Electrical – Starter Motor Refurbishment click here.

There are lots more photos in the above link.

Photo Menu – Engine Bay – Water Thermostat Replacement click here.

Again more photos in the link above.

Those sharp eyed among you will notice that the distributor looks a lot better than it did. It has of course been restored, as soon as I have sorted those photos out I will post a photo walk though of that distributor refurbishment process. Watch this space!

Share my Content

Raising The Standards

The weekend was a strange experience for me as I didn’t get to walk into my garage and see my car there. It is of course in the safe hands of Mustang Maniac in their panel shop. I got up and got ready to go in record time, packed some overalls and tools and took myself off to see the guys. All the way down there I had a silly grin on my face knowing full well I was going to get covered in various lubricants that were leaking from my car if any was still in it that is. On arrival I was speaking to Adam and catching up with all things Mustangs, I was shown new parts that I decided I was going to have along with other parts I was going to get a bit later on. I just have to get this minor detail cleared with the accounts manager, my wife first though. I would like to point out that I was given permission to work with the guys and this is certainly not a normal practice. I just wanted to help get the gearbox, and/or engine out, just so that I can be a part of it all. Adam knows about my blog and has made the kind concession for me. I got changed and ready to go. I was told the procedure to remove the main parts of the car; the prop shaft, gearbox and then the engine, not forgetting all the other attachments between them.

I set to work straight away by getting the car up on some nice big high axle stands, I got my tools out and started to remove the radiator, alternator and starter motor.

Next up was the prop shaft which I have started a renovation guide here,  or can be found under the Photo Menu – Gearbox & Prop Shaft – Prop shaft renovation.

Working on the engine I was to remove the headers to make room for the next part I wasn’t looking forward too, the transmission cooling pipes that run from the gearbox to the bottom of the radiator. The headers were not bolted in correctly to the block and the dark black soot on the header pipe end itself proves the point. The gasket fell apart as the pipes were removed as well.

The radiator, starter motor and cooling pipes removed, the transmission pipes are now scrap due to the poor amateur installation of the gearbox. You can just about make out the rubber hose on the ends on the transmission pipes.

Terry told me what to look for and a gave me the specialist tool to get to the connections. But what I found was a common botch job, the pipes had a hacksaw taken to them and fitted with a bit of fuel pipe hose and a jubilee clip each end. The botch job is to make it easier to remove the gearbox and refit it, obviously these people didn’t know what they were doing. This saved using the specialist tool as the rubber pipes had perished and now I could see where the leaks were coming from. All the cables, such as the speedo, kickdown throttle linkage, shifter rod, neutral safety switch, hand brake etc were all removed to allow the gearbox freedom of movement. The flywheel and torque converter were undone and the converter was bushed into the bell housing to make the separation easier. The bell housing bolts and support brackets for the gearbox were removed once the weight of the gearbox was taken up underneath as the gearbox and engine were separated. The gearbox was lowered down and moved to the side away from the car.

I have a renovation page for the gearbox process too under Photo Menu – Gearbox & Prop Shaft – Gearbox Renovation or click here for the quick link. All sounds so simple or so it seems, what took me all day takes the guys a matter of hours. I think I held them up a bit!

I would like to say a big “Thanks” to Adam, Terry, John and Al for helping me out and their invaluable guidance. It was an experience and I am grateful for the knowledge overload that came my way. This type of work I couldn’t do at home as I simply don’t have the heavy gear to do these jobs. I was right about one thing though, I was smothered in all sorts of grime, so the intentions to take photos of all process didn’t really happen from the transmission lines onwards as I didn’t want to drop my camera. But, I have taken some photos under the Photo Menu and I am sure there will be many more to follow. The next time I looked outside it was dark so I reluctantly called it a day, in fact, I called it a very good day. I drove home feeling as though I had achieved something big from my point of view. I am sure there will be more days to feel like I’m sure. I was a happy chap knowing the work I was doing was being aided by the guys who really knew what they were doing.

Oh, remember that daft silly grin I had on the way down there? Well it just got a whole lot bigger all the way home. 😀

Share my Content